Schematics

US 83 – $800M+ Future Interstate Project

Menard County, Texas
LTRA is the prime consultant for this 38-mile schematic project for the TxDOT San Angelo District from the Concho County Line to Junction, TX. LTRA completed schematic design, environmental permitting, traffic analysis, and public involvement for the project. US 83 is a part of the “Ports to Forts” Corridor which will be designated as Interstate 14, a new multi-state interstate highway to connect major military bases in the southern US. The project was phased to widen the existing 2-lane rural highway to a 4-lane divided highway, with a typical section and roadway geometry that will accommodate future conversion of US 83 to a controlled access interstate. Interchange alternatives were considered for multiple rural interchange locations along US 83. LTRA engaged in extensive public involvement for the project, incorporating public feedback into the schematic process.

Budget

Timeline

 – 

LTRA Logo Element Blue

Services provided

Schematic Design
Environmental Permitting
Public Involvement
Traffic Analysis
Interstate Conversion
Phased Implementation
Drainage Design
Bridge Design
Surveys
ROW Mapping

Photo Gallery

Project highlights and key achievements

LTRA engaged in extensive public involvement for the project, incorporating public feedback into the schematic process.

Blue LTRA vector

related project

Get In Touch

We’re glad you stopped by. Please drop us a line and introduce yourself. We enjoy collaborating with new people and discovering opportunities.

Keep Up
With LTRA

Follow us on social media