FM 1385  – $320M Major Arterial

Denton County, Texas
LTRA was chosen by TxDOT Dallas District and Denton County to lead a major regional mobility and development project in North Texas by developing both the schematic and PS&E designs for FM 1385. This major project upgrades 12.1-miles of existing 2-lane rural roadway to a 6-lane divided urban typical section from US 380 in Prosper, TX to FM 455 in Pilot Point, TX. LTRA worked with various cities (Pilot Point, Prosper, Celina, Aubrey), Denton County, TxDOT, and multiple developers to accommodate a constantly changing environment in a rapidly developing sector of Denton County. LTRA identified and resolved conflicts with several major regional utilities by refining the roadway geometry, cutting months off the schedule and reducing utility relocation costs by several million dollars. LTRA divided the FM 1385 corridor into three separate construction packages to accommodate TxDOT funding constraints. The FM 1385 project will improve safety and reduce delays on an important regional arterial in Denton County.

Budget

Timeline

 – 

LTRA Logo Element Blue

Services provided

Schematic Design
Environmental Permitting
Public Involvement
Traffic Analysis
Drainage Design
Bridge Design
Traffic Control Plan
3D Modeling Design
Utility Engineering

Photo Gallery

Project highlights and key achievements

LTRA divided the FM 1385 corridor into three separate construction packages to accommodate TxDOT funding constraints.