Municipal

Southgate Plaza – $152M – Commercial Development

DFW Airport, Texas
LTRA was chosen by DFW Airport to manage the design of 32 acres of mixed use development that included the future DFW Airport headquarters building. The development was located on the east side of International Parkway, between Rental Car Drive and the Consolidated Rental Car Center. Project scope included the development of commercial pad sites and all required civil infrastructure (roadways, drainage, grading, etc.). LTRA proactively developed site grading and drainage for the project with minimal disruption to Trigg Lake, a drainage reservoir serving the entire DFW airport property. LTRA was able to maintain traffic operations to International Parkway and Rental Car Drive by strategically phasing roadway construction elements. The Southgate Plaza project was completed and DFW moved into their new headquarters building in 2016.

Budget

Timeline

 – 

LTRA Logo Element Blue

Services provided

Drainage Design
Landscaping
SW3P
Traffic Control Plan
Utility Engineering
Surveys

Photo Gallery

Project highlights and key achievements

LTRA proactively developed site grading and drainage for the project with minimal disruption to Trigg Lake, a drainage reservoir serving the entire DFW airport property.

Blue LTRA vector

related project

Get In Touch

We’re glad you stopped by. Please drop us a line and introduce yourself. We enjoy collaborating with new people and discovering opportunities.

Keep Up
With LTRA

Follow us on social media